Oh, hey new bathroom!

A little delayed, but I hope you all had a fabulous 4th of July!  We sure had a great long holiday weekend, we accomplished a lot!  We also got to relax and get together with friends.  I would say it was a successful little break.

Now lets get back to this bathroom! Last we left off it looked something like this…

P1070121_Fotor

We were well on our way to a new bathroom, but still had a few things on our list to finish up.  First up Justin installed the new mirror, which was also purchased from Lowe’s.  The mirror was the match to our new vanity…

They are both Style Selections Longshire Brand in Espresso finish.

P1070146_Fotor

Here they are all installed and hung! Much better than that 90’s vanity we had going on before. The next thing we wanted to tackle in here was the sink, having a toilet is great but let me tell you… it’s even nicer when you have a sink! So Justin got right to it.

P1070131_Fotor

Look at that beautiful new sink!

P1070147_Fotor

It’s even nicer when it’s on a vanity and hooked to plumbing!

P1070172_Fotor

This sink isn’t just for show… it works! Justin really is becoming quite handy.

P1070173_Fotor

There’s our new mirror and a little glimpse of the new light.

Next up I had to finish painting the trim and give the wainscoting one last coat.

P1070154_Fotor

Here it is all nice and white…

P1070176_Fotor

From here we were done with the painting and installing and it was just time to put this bathroom back together.

P1070179_Fotor

Our last toilet paper holder was attached to our vanity.  We really didn’t want to have it hanging off the vanity this time and the wall behind it was a little to far of a reach.  So, I picked up this guy at homegoods, it was only $14 and matched all of the faucets and the light fixture.  Which I unfortunately did not get any good photos of.  It is also from Lowe’s…

Just picture this guy on our wall above the mirror.

I also finally got to put up the shower curtain that started this whole bathroom renovation…

P1070180_Fotor

Sorry about the weird angle, it’s a small bathroom.  I bought this shower curtain at Target for $19. I love anything in an ikat pattern!  I also purchased that bath mat from homegoods for $12.  Here is the bathroom pretty much finished…

P1070181_Fotor

I still have to add some decorations and I already have some things brewing in my mind! Here is our updated list…

  1. Patch and sand all walls.
  2. Paint walls.
  3. Add wainscoting and chair rail to walls.
  4. Paint wainscoting, chair rail and trim.
  5. Tile and grout floor. 
  6. REINSTALL TOILET.
  7. Install new faucets and shower head in bathtub.
  8. Install new light fixture.
  9. Install vanity.
  10. Install mirror.
  11. Install towel bar.
  12. Decorate! :)

Last thing I want to show you is a before and after…

picisto-20130707191637-617509

Click the photo! It gets bigger!

The first photo is before we moved in, the second is once we moved in and I painted the walls green.  The last photo is now!  Woo hoo!

Change In Plans

I decided this weekend would be a good time to re-paint the guest bath.  So I headed to homegoods and target to find a new shower curtain to start.  I wanted to get a new shower curtain first, so I could pull a color from pattern for the paint.  I ended up having success and headed to Lowes to get a color that would match.  I made it home and showed Justin all of my finds.  Next thing I knew he was talking about removing the medicine cabinet before I painted because we really hate it.  I agreed and let him pull it out of the wall.

P1060900

Here she is, so we can all say our last goodbyes.

P1060905

Justin immediately started removing the cabinet when I said yes.  I figure I would start painting the other half of the bathroom while he patches the whole in the wall where the cabinet was.

P1060913

I also requested that we take down the exisitng towel bar and move it to the other wall.  I wanted to move the bar because where it currently was located I wasn’t able to hang a full towel.  I figured if we moved it to the opposite wall I could hang some kind of art above the toilet.  So the towel bar came down too.

P1060911

I thought we were done from there and I could begin painting. Well, I was wrong and Justin had another idea, he wanted to remove the mirror.  I did hate the mirror and I thought that would also be an easy fix so we took that down too.

P1060915

Once the mirror was down we could see all the gross grime that was left in the crevices where it was.

P1060921

Grrrross. Justin then said, while were at it we might as well remove the vanity since its old and we don’t love it either.  You can probably guess that I agreed and we started removing that as well.

P1060918

We started by removing the doors first.

P1060920

Justin then shut off the water and we started removing the plumbing below the vanity.

P1060923

I was lucky enough to get the job of removing the pipes and letting the old water and hair fall on me, not to mention the fabulous smell that comes with it.

P1060924

From there we removed the vanity top and the sink, turns out the sink was plastic, who woulda thought! Once the vanity top was off we saw this…

P1060927

A big hole in the drywall, not a good thing the discover.  We were now worried that there was no dry wall behind the vanity at all.  There was no turning back at this point so we trucked on.

P1060931

It took some prying and shimmying, but we got the whole vanity out and we were happy to find drywall!  Turns out it was just a small hole on the left side. Phew!

At this point we decided we had no choice but to remove the tile as well since there was no tile under the vanity and the new vanity we were imagining was a free standing one.

P1060932

So we started prying tiles out to find that the previous owners of this home tiled right over the original linoleum. Woo hoo one more thing to remove!

P1060942

We removed the tile by using a mason chisel and hammer.  We tapped the chisel under the tile, more like slammed the chisel under the tile and then pried them up.

P1060933

This job was not quick, we pried them up in pieces until every tile was gone.

P1060935

Also this job is kinda dangerous.  Justin and I were bleeding on our hands and arms and I even was bleeding from my forehead.  Little shards of ceramic tile pop up when you chisel them out. Fun stuff! From here we called it a night considering it was 8pm.

Bright and early I went to town removing the rest of the tile while Justin was prepping the wall to repair the hole from the medicine cabinet.  This time I was prepared though!

P1060941

Yes, Justin got me a safety mask and yes I am wearing the same shirt.

Justin also removed the toilet so I could get the tiles that were under the edges of it.  So once I finished removing the tile and ripping up the remaining linoleum it looked like this…

P1060954

Do you notice anything on the floor in this photo? Possibly a crack in the foundation?

P1060956

Oh hi crack! At this point we were thinking this project just got really expensive, so we called Justin’s dad.  Turns out it is perfectly normal for the foundation to settle and to get cracks in some areas. Man were we relieved!

While I finished up Justin had already installed the drywall to fill the hole in the wall.

P1060946

Finally making some progress!

From there Justin’s dad told us we should probably pour down some cement underlayment, so we are sure the floor is level when we lay the new tile.  So off I went to Lowes and picked up a bag of this…

093994178527

Once I got home Justin mixed up a batch of the cement and started pouring it in.

P1060975

At this point we need to wait for the underlayment to settle and dry for 24 hours and then we can start laying tile and working on other projects in the room! Man this project got big fast!